Articles from Green Bridge Metals Corporation

Green Bridge Metals Intersects 195.0 Metres Grading 0.25% Cu and 10.18% TiO2 at Titac South, Minnesota; Step-Out Hole Confirms Mineralization at Previously Untested Geophysical Target
VANCOUVER, BC / ACCESS Newswire / September 10, 2026 / Green Bridge Metals Corporation (CSE:GRBM)(OTCQB:GBMCF)(FWB:J48, WKN: A3EW4S) ("Green Bridge" or the "Company") is pleased to report the final assay results from its Phase 1 diamond drill program at the Titac Project, located within the Company's South Contact Zone Project in northeastern Minnesota, U.S.A. (Figure 1).
By Green Bridge Metals Corporation · Via ACCESS Newswire · September 10, 2026
Green Bridge Metals Obtains Exploration Drilling Plan Approval and Selects Foraco for Phase 1 Diamond Core Drilling at Serpentine Copper-Nickel Project, Minnesota, USA
VANCOUVER, BC / ACCESS Newswire / July 2, 2026 / Green Bridge Metals Corporation (CSE:GRBM)(OTCQB:GBMCF)(FWB:J48,WKN:A3EW4S) ("Green Bridge" or the "Company") is pleased to announce that it has received approval of its exploration plan from the Minnesota Department of Natural Resources (DNR) for its flagship Serpentine Copper-Nickel Project ("Serpentine" or the "Project") in St. Louis County, Minnesota. The Company has also selected Foraco International ("Foraco") to conduct a minimum of 1,640 meters of diamond core drilling as part of the planned Phase 1 program.
Articles from Green Bridge Metals Corporation | WAOW